8. Client Report
This report is safe to show or send to the client. It focuses on the chosen development package, visible budget, payment plan, timeline, update methods, and next steps.
Estimated development budget
₹0
Development timeline
6 month(s)
Client and project details
Client: -
Mobile: -
WhatsApp: -
Email: -
Project: -
Location: -
Plot size: -
Built-up area: -
Project type: Farmhome
Style direction: -
Services in scope
Farmhome Development
Development package summary
Core drawings, standard structure specs, essential kitchen and bathroom provisions, and baseline finishes.
Upgrade note: Good starting point when the client wants a practical base scope and plans to phase enhancements later.
Drawing and design scope
- Architectural Layout | 2D
- Basic Elevation
- Structural Design
- 3D Elevation
Structural specification summary
- Steel - Sunvik or Prime Gold or Kamadhenu or equivalent
- Cement - Dalmia, Bharathi or equivalent of 43 or 53 grade
- Aggregates - 20mm & 40mm
- Blocks - Standard Solid Concrete blocks, 6 inch & 4 inch
- RCC Design Mix - M20 / M25 or as per the structural designer recommendation
- Ceiling Height - 10 feet (Finished Floor level to Finished Floor level)
Kitchen specification summary
- Ceramic Wall Dado - upto Rs.40 per sqft
- Main Sink Faucet - upto Rs.1300
- Any other Faucet or Accessories - ISI marked
- Kitchen Sink - Stainless Steel of Single Sink make worth Rs. 3,000
Bathroom specification summary
- CPVC Pipe - APL Apollo or equivalent
- Bathroom doors - Waterproof flush doors or WPC
Door and window specification summary
- Windows - Aluminium windows with glass shutters and mesh shutters (3 track with 1 mesh) of Jindal profiles
- Main Door - Flush door with veneer, Sal wood frame of 5 inch by 3 inch, worth Rs.20,000 including fixtures
- Internal Doors - Membrane doors / Flush Door with laminates upto Rs.11,000 including fixtures
- Door Frames of Sal Wood 4 inch by 2.5 inch
Painting and electrical specification summary
- Interior Painting - JK Putty + Tractor Emulsion or equivalent
- Exterior Painting - Asian Primer + Ace Exterior emulsion paint or equivalent
- All wiring with fire proof wires of Finolex silver FR or equivalent
- Switches & Sockets - Legrand Allzy or equivalent
Included elements
No elements marked as included yet.
Excluded elements
No exclusions marked yet.
Optional upgrades
No optional upgrades marked yet.
Future phase items
No future phase items marked yet.
Needs discussion
Boundary Wall with Y AngleCottage with Veranda cum PorchSwimming Pool with Kid's SectionPool DeckPool Changing RoomLawn PathwayMachaan with GazeboOpen Bar CounterCar ParkingDesigner Main GateStore RoomGenerator PlinthGuard Room, Toilet, and KitchenKitchen GardenWater and Electrical SupplyWater BoringLawn with LandscapingDesigner Outdoor Lawn LightsFruit PlantationVaastu ComplianceSolar LightsSunken DeckOuthouse with DeckWaterfall or Water Fountain
Budget summary
Estimated development budget: ₹0
Optional upgrade budget: ₹0
Budget with optional upgrades: ₹0
Taxes / approval note: Taxes, approvals, and statutory charges are excluded unless specifically included in writing.
Pricing disclaimer
All development budgets, package values, material allowances, and element-wise estimates in this report are based on prevailing market rates, vendor inputs, and project assumptions as on the date of issue. Hindpride reserves the right to revise pricing, scope values, and final commercial terms before scope freeze and final agreement in the event of changes in material prices, labour rates, vendor quotations, statutory charges, site conditions, design revisions, or broader market fluctuations.
Payment plan
Booking / Design Advance
Percentage to be finalized
To begin planning and concept work.
Status: upcoming
Design Finalization
Percentage to be finalized
When layouts and scope are finalized.
Status: upcoming
Foundation Stage
Percentage to be finalized
At foundation mobilization and completion milestone.
Status: upcoming
Structure Stage
Percentage to be finalized
When the core built structure reaches the agreed milestone.
Status: upcoming
Roofing / Slab Stage
Percentage to be finalized
At slab or roofing completion milestone.
Status: upcoming
Finishing Stage
Percentage to be finalized
When finishing work enters the agreed progress point.
Status: upcoming
Landscaping / Add-ons
Percentage to be finalized
At outdoor works and selected add-on execution stage.
Status: upcoming
Final Handover
Percentage to be finalized
Before final handover and closeout.
Status: upcoming
Development timeline
Design & Scope Freeze
1 month(s)
Add-ons / Landscape
1 month(s)
Development updates
No update methods selected yet.
No extra update note added yet.
Assumptions
Quote subject to site visit, scope freeze, and final specification alignment.
Exclusions
Approvals, statutory charges, taxes, and items not listed in the scope stay outside this report unless added separately.
Next steps
Review scope, freeze selected elements, align payment stages, and confirm the next consultation step.
Hindpride contact
+91 909-909-5581
design@hindpride.com
Assotech Business Crestera Tower 4, Unit 209, 2nd Floor Sector 135, Noida